BATHROOM REMODELING · CHARLOTTE, NC & FORT MILL, SC

Bathroom Remodeling in
Charlotte & Fort Mill

A Bathroom Worth Waking Up To.

Bathrooms designed around how you get ready, relax and live, then built by one licensed team from demo to final walkthrough.

Primary bathroom with freestanding tub, walnut double vanity and glass walk-in shower

PRIMARY BATHROOMS

YOUR OWN.
PRIVATE RETREAT.

Walk-in showers, soaking tubs, double vanities and heated floors. Charlotte-area bathroom remodels typically run about $15,000 to $30,000 for a hall bath and $35,000 to $75,000 for a full primary bathroom, with luxury suites above that.

• Walk-in and curbless showers
• Freestanding and soaking tubs
• Double vanities and storage
• Heated floors and quiet ventilation
• Layered lighting

TUB-TO-SHOWER CONVERSIONS

TRADE THE TUB
FOR A BETTER SHOWER.

Many bathrooms still have a tub nobody uses. We remove it, update the plumbing and framing behind it, and build a walk-in shower with proper waterproofing, a bench or niche and glass.

• Tub removal and plumbing changes
• Waterproofed shower pans
• Benches, niches and glass
• Low or no-curb entries
• Matching tile and trim

Iconic Build and Design crew setting white subway tile and a shower niche in a walk-in shower
Aging-in-place bathroom with grab bars, comfort-height toilet and wood vanityOpen-concept kitchen with island seating, white cabinets and pendant lights after a whole-home renovation

AGING-IN-PLACE BATHROOMS

SAFE NOW.
SAFE LATER.

Curbless showers, grab bars that look like design pieces, comfort-height toilets and vanities, wider doorways and slip-resistant tile, so the bathroom works at every stage of life.

• Curbless roll-in showers

• Built-in benches and grab bars

• Comfort-height fixtures

• Wider doorways

• Slip-resistant tile

PLAN ONCE, ENJOY FOR YEARS

LAYOUT FIRST.
THEN THE TILE.

We start with plumbing locations, ventilation and storage, then help you choose tile, fixtures, glass and lighting before demolition so the schedule holds.

• Layout and plumbing plan

• Ventilation sized right

• Selections finalized before demo

• Lighting and mirror plan

• One point of contact

Green and white bathroom tile samples laid out for selection before demolitionKitchen design plans with cabinet, countertop and tile samples
Bathroom shower walls waterproofed and ready for tile during a remodel

WHAT IS INCLUDED

ONE TEAM
FROM DEMO TO DONE.

Design, selections, permits, demolition, plumbing, electrical, waterproofing, tile, glass, paint and final clean, all coordinated by one team.

• Design and drawings
• Selections support
• Plumbing and electrical
• Waterproofing and tile
• Glass, fixtures and paint

PERMITS & TIMELINE

ONE TEAM. START TO FINISH.

We handle the permits and inspections, order fixtures, tile and glass early, and give you a clear schedule before demolition. Most bathroom remodels take about 3 to 6 weeks of construction, depending on scope. Licensed in North Carolina (#L.104275) and South Carolina (#126600).

• Permits and inspections handled
• Clear schedule before demo
• Fixtures and glass ordered early
• Weekly updates
• Final walkthrough and clean

Bathroom near completion with new tile and vanity before the glass is installed

OUR PROJECTS

SEE THE BATHROOMS
WE HAVE BUILT

Explore completed bathrooms, primary suites and whole-home renovations across Charlotte, Fort Mill and the surrounding area.

How a Bathroom Remodel Runs With Iconic

A bathroom packs plumbing, waterproofing, tile and glass into a small room, so the order of work matters. Every Iconic bathroom starts with the layout and selections settled before demolition, and larger bathroom remodels run in two phases.

Phase 1: Build Ready

You finish Phase 1 with a locked design and selection set, a firm construction number built from crew pricing we hold in hand, and a schedule with a start date and milestone dates.

Phase 2: Build

Permits are pulled when the work calls for them, and materials are ordered and staged before we start. One project manager is your contact the whole way, with a written update every week and an online project dashboard for your schedule, selections, documents, invoices and progress photos.

How Long Does a Bathroom Remodel Take?

On-site time depends on the scope:

• A refresh in the same layout, with new fixtures, vanity and finishes: about 3 weeks

• A mid-range remodel with a new shower or tub, tile and vanity: about 4 to 5 weeks

• A full primary bathroom remodel that moves plumbing or walls: about 6 to 8 weeks

Glass shower doors and stone countertops are installed about 7 business days after we measure. In-stock tile is ready right away, and custom tile takes about 2 weeks. On-site work begins once materials arrive.

Bathroom Remodel Questions We Hear Most

Can you turn my tub into a walk-in shower?

Yes. We convert tubs to walk-in showers, including low-curb and curbless showers with grab bars and benches for aging in place.

How do you keep a new shower from leaking?

We install a waterproofing system behind and under the tile before it goes in, and we check the slope to the drain so water leaves the shower floor.

Do I need a permit for a bathroom remodel?

Moving plumbing, adding circuits or changing walls usually needs one. When it does, we pull the permit and coordinate every inspection.

Can we use another bathroom during the work?

If your home has a second bathroom, yes. When it is the only one, tell us at the walkthrough and we plan the schedule around keeping the time without a working bathroom as short as possible.

Are you licensed, insured and bonded?

Yes. Iconic Build and Design is a licensed general contractor in North Carolina and South Carolina, and we are insured and bonded. Our workmanship is warranted for one year beginning at Substantial Completion.

Do you work with Spanish-speaking clients?

Yes. Our team works with clients in English and Spanish.

READY TO GET STARTED?

Ready to Build Something Iconic?

Tell us what you're planning and let's start the conversation.

BUILD BOLD. DESIGN ICONIC.