KITCHEN REMODELING · CHARLOTTE, NC & FORT MILL, SC
The Room Everyone Gathers In.
Kitchens designed around how you cook, gather and live, then built by one licensed team from demo to final walkthrough.

New layout, cabinetry, counters, lighting, flooring and appliances. Charlotte-area kitchen remodels typically run about $25,000 to $45,000 for a refresh and $60,000 to $120,000 for a full mid-range remodel, with luxury kitchens above that.
• Layout and design
• Custom and semi-custom cabinetry
• Quartz, granite and stone counters
• Lighting, plumbing and electrical
• Flooring, tile and backsplash
Removing or opening a wall can connect your kitchen, dining and living space. We check whether a wall is load-bearing or carries plumbing, ductwork or wiring, and engineer the support when it is needed.
• Load-bearing wall assessment
• Beams and structural support
• Rerouted plumbing and ductwork
• Patched floors that match
• Permits and inspections handled


An island with seating, a walk-in or cabinet pantry, deep drawers and appliance garages change how a kitchen works more than any finish. We plan storage around how you actually cook.
• Kitchen islands with seating
• Walk-in and cabinet pantries
• Deep drawers and pull-outs
• Appliance garages and coffee bars
• Under-cabinet and pendant lighting
We start with work zones and traffic flow, then help you lock in cabinets, counters, tile and fixtures before demo so construction stays on schedule. We also help you plan a temporary kitchen while yours is being built.
• Work zones and traffic flow
• Selections finalized before demo
• Layered lighting plan
• Temporary kitchen setup
• One point of contact


Design and layout, help with selections, permits, demolition, framing, plumbing, electrical, HVAC adjustments, drywall, cabinets, counters, tile, paint and final clean, all coordinated by one team.
• Design and drawings
• Selections support
• Demolition and framing
• Plumbing, electrical and HVAC
• Cabinets, counters, tile and paint
We handle the permits and inspections, order long-lead items like cabinets and appliances early, and give you a clear schedule before demolition starts. Most kitchen remodels take about 6 to 12 weeks of construction, depending on scope and selections. Licensed in North Carolina (#L.104275) and South Carolina (#126600).
• Permits and inspections handled
• Clear schedule before demo
• Long-lead items ordered early
• Weekly updates
• Final walkthrough and clean

Explore completed kitchens, open-concept remodels and whole-home renovations across Charlotte, Fort Mill and the surrounding area.
Every Iconic kitchen starts with a plan: the layout first, then cabinets, countertops, tile, fixtures and lighting, all chosen before demolition. Larger kitchens that need permits run in two phases.
You finish Phase 1 with a locked design and selection set, a firm construction number built from crew pricing we hold in hand, and a schedule with a start date and milestone dates. Nothing is left as an allowance guess.
Permits are pulled when the work calls for them, and materials are ordered and staged before we start. One project manager is your contact from demolition to the final walkthrough, with a written update every week and an online project dashboard for your schedule, selections, documents, invoices and progress photos.
On-site time depends on the scope:
Cabinet, countertop and finish updates in the same layout: about 3 to 4 weeks
A mid-range remodel with new cabinets, counters, tile and lighting: about 6 to 8 weeks
A full remodel that moves walls, plumbing or the layout: about 12 to 15 weeks
Materials set the start date. Cabinets take about 2 weeks to order and build. Quartz countertops are installed about 7 business days after we measure the new cabinets. In-stock tile is ready right away, and custom tile takes about 2 weeks. On-site work begins once materials arrive, and permit review time is not part of these ranges.
Work that moves walls, plumbing, gas lines or electrical circuits usually needs one. When it does, we pull the permit and coordinate every inspection.
Yes. Keeping the layout is often the fastest path. When a wall, island or appliance move would make the kitchen work better, we show you what it involves before you decide.
Not from demolition until the counters and plumbing are back in. We share the schedule at the start so you can plan a temporary setup.
Often, yes. Some walls carry structural loads or hide plumbing and ductwork. We check before design and plan the beam, ductwork and permit work when needed.
Yes. Iconic Build and Design is a licensed general contractor in North Carolina and South Carolina, and we are insured and bonded. Our workmanship is warranted for one year beginning at Substantial Completion.
Yes. Our team works with clients in English and Spanish.
Tell us what you're planning and let's start the conversation.